Madisonville: Demolition of specific structures at 116 College St. The buildings may/may not have asbestos materials inside. If involved, removal and disposal of asbestos materials must meet all federal, state, and local requirements. The contractor is responsible for all notifications and fees for the demolition and asbestos removal, if applicable. Demolition includes removal of a specific addition and out-building structure, removal of miscellaneous debris associated with the structure, and relocation of electrical supply. The Contractor shall be responsible for all utility disconnections.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
69 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950