MSCAA: DeWitt Spain Airport – Levee Pump – Construction Demolition of South End of Concourses “A” & “C” – Construction The scope of work generally consists of demolition for the south end of Concourses A & C. Individual trade work includes but is not limited to mechanical and plumbing termination of duct work and sewers; and reconnecting of chill water, hot water, and domestic water. The electrical work involves termination and removal of existing circuits and low voltage cabling that are to be abandoned, as well as removal of substation 13. The contract will also include hauling of rubble and backfill of the existing tunnel. Brick masonry and glazing will fill the end of the corridors that remain after demolition Bids due 07/03
Find details to this bid and hundreds more nationwide at http://www.envirobidnet.com - Try a 30 Day Free Trial (no cc card required)
Most Users Ever Online: 429
Currently Online:
57 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950