Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
TN - DeWitt Spain Airport: demolition for the south end of Concourses A &
June 8, 2014
6:26 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

MSCAA: DeWitt Spain Airport – Levee Pump – Construction Demolition of South End of Concourses “A” & “C” – Construction The scope of work generally consists of demolition for the south end of Concourses A & C. Individual trade work includes but is not limited to mechanical and plumbing termination of duct work and sewers; and reconnecting of chill water, hot water, and domestic water. The electrical work involves termination and removal of existing circuits and low voltage cabling that are to be abandoned, as well as removal of substation 13. The contract will also include hauling of rubble and backfill of the existing tunnel. Brick masonry and glazing will fill the end of the corridors that remain after demolition Bids due 07/03

Find details to this bid and hundreds more nationwide at http://www.envirobidnet.com - Try a 30 Day Free Trial (no cc card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
57 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar