Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
TN - Chattanooga: Demolition and rubblization of remaining standing structures
December 16, 2018
10:27 AM
Avatar
Admin
Forum Posts: 7090
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Chattanooga: Lupton City Remediation. The project consists of the following major elements of construction including but not limited: Demolition and rubblization of remaining standing structures, rubblization of remaining materials, site grading, installation of storm drain piping, and additional work at the old Lupton Mill site, 1210 Mercer Street, Chattanooga, TN. Additional work includes, but is not limited to, spreading and compacting rubble in designated locations, perforating existing flooring, perforating existing concrete slabs, full or partial removal of concrete structures, clearing and grubbing of vegetation, and installation of new fencing.

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
79 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar