Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
SPD Renovation 688-326
September 11, 2009
9:20 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

STATE OF WORK Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the project Renovate SPD for Infection Control which involves renovation in Building 1 of the existing SPD facility, relocation and renovation of Acquisitions and Material Management(AMMS) and Female Locker Room and relocation of a portion of AMMS and EMS to the warehouse on the first floor located at the VA Medical Center, 50 Irving St., N.W., Washington, D.C. 20422. Contractors proposal shall completely prepare site for building operations, to include general construction, supervision, demolition and removal of existing structures, mechanical and electrical work, tools, equipment, labor, materials, as required by the drawings, specifications and contract documents.

Contracting Office Address:
Department of Veterans Affairs
VAMC(688)
50 Irving Street NW
Washington DC 20422

Point of Contact:
Robert Perry
Contract Specialist
(202) 745-2443

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
117 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar