Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
SOURCES SOUGHT: Renovation and Demolition
February 22, 2010
8:01 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

This is a SOURCES SOUGHT ANNOUNCEMENT for planning purposes only. Market research is being conducted to determine if there are HUBZone small businesses with the capabilities and experience to perform the required work. All interested parties are invited to submit a capabilities statement to include three projects completed within the last five years that are relevant to the work that will be required under this project. Provide a point of contact for each project listed. Electronic versions of your capabilities statement shall be submitted VIA E-MAIL ONLY TO: arnold.johnny [at] dol.gov. (Johnny A. Arnold II, Contract Specialist,) Responses are due by FEBRUARY 25, 2010 by 3:00 p.m. EDT. NO TELEPHONE CALLS WILL BE ACCEPTED. PLEASE NOTE THIS IS NOT A REQUEST FOR PROPOSAL.

The North American Industry Classification System (NAICS) code is 236220. PROSPECTIVE BIDDERS MUST BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR). Information regarding registration can be found at http://www.ccr.gov/.

The work is for renovation of the dining hall and food preparation portions of the Cafeteria/Culinary Arts Building. The existing building totals approximately 11,740 gross square feet with approximately 9,100 gross square feet associated with the food preparation, food service and dining areas, and approximately 2,640 gross square feet associated with culinary arts training. The kitchen and dining portions of the building were constructed in 1975 with an addition to the building for the culinary arts vocation, constructed by the center, which was completed in 2002. The project consists of phases. Which consists of the demolition of two (2) dormitory buildings and the restoration of the temporary serving and dining space.

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
98 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar