Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Skull Canyon Bridge @ Stoney Creek
February 15, 2006
6:52 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

The work consists of constructing a new glued laminated deck system for Skull Canyon Bridge and replacing the existing bridge at Stoney Creek with a pre-stressed concrete bridge. Work for the Skull Canyon Bridge includes demolition of existing deck and curbs for entire bridge length, disposal of debris, construction of a new deck with glued laminated panels, replacing bulkheads, installing new wheel guards and rail system, placing riprap under the bridge, modifying the existing concrete wingwalls, designing, providing, and constructing a prefabricated modular retaining wall system, paving asphalt approaches, temporary and permanent signing and all associated site work. Work for the Stoney Creek Bridge includes demolition of the existing bridge superstructure and substructure, constructing new concrete abutment footings, designing, providing and installing a contractor-engineered pre-stressed concrete slab bridge, bridge railing, constructing and removing a temporary by-pass road, riprap, asphalt approaches, traffic control, permanent signing and all associated site work. These bridges are located in Grant County, west of US Highway 395 on the North Fork John Day River Road near Dale, Oregon in T7S., R29E., Sections 2 and 10, W.M. Project price range is between $250,000 and $500,000. NAICS: 237310. Project site is located in Grant County, Prineville District, Oregon. Estimated start work is April 1, 2006 and performance time is 175 calendar days. Bonds are required - Bid Bond: 20%; Performance Bond: 100%; and Payment Bond: 100%. This solicitation will be posted electronically. Paper copies are no longer available.

[font=Verdana]POINT OF CONTACT:[/font]

[font=Verdana]Donna J. Boehm, Procurement Technician, (503) 808-6210, [email="Donna_Boehm@blm.gov"]Donna_Boehm@blm.gov[/email][/font]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
110 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar