Old Terminal Demolition; The proposed work includes the following items and approximate quantities: Phase 1 Old Terminal Building Demolition and New Apron Construction: Old Terminal Building Demolition - approximately 29,175 S.F. single story brick building and surrounding walkways driveway and parking lot, 8,350 S.Y. of 11 inch PCC pavement, 785 S.Y. of 8 inch PCC Pavement, earthwork geotextile fabric, crushed aggregate base, milling, plant mix bituminous pavement, joint sealing, aircraft tiedowns, runway and taxiway painting, underdrains, storm sewer, seeding, topsoiling, fiber mulching, erosion control measures, temporary and new fence, gate and lighting relocation, Phase 2 Apron Reconstruction: 6,931 S.Y. PCC pavement removal, 3,475 S.Y. of 15 inch PCC pavement, 3,575 S.Y. of 11 inch PCC Pavement, earthwork geotextile fabric, subbase material, crushed aggregate base, plant mix bituminous pavement, joint sealing, aircraft tiedowns, runway and taxiway painting, underdrains, storm sewer, seeding, topsoiling, fiber mulching, erosion control measures, Phase 3 Apron Reconstruction: 8,564 S.Y. bituminous pavement processing, 5,450 S.Y. of 11 inch PCC pavement, 3,475 S.Y. of 8 inch PCC Pavement, earthwork geotextile fabric, subbase material, crushed aggregate base, recycled aggregate base, milling, plant mix bituminous pavement, joint sealing, runway and taxiway painting, underdrains, storm sewer. Bids due 06/18
Find details to this bid and hundreds more nationwide at http://www.envirobidnet.com - Try a 30 Day Free Trial (no cc card required)
Most Users Ever Online: 429
Currently Online:
64 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950