RAPID CITY REGIONAL AIRPORT RAPID CITY, SOUTH DAKOTA; The proposed work includes the following items and approximate quantities: Old Terminal Building Demolition: - approximately 29,175 S.F. single story brick building and surrounding walkways driveway and parking lot, 192 S.Y. of 11 inch PCC pavement, earthwork geotextile fabric, crushed aggregate base, plant mix bituminous pavement, joint sealing, storm sewer, water main replacement, erosion control measures, and temporary fence. Bids due 09/03
For details to this bid and hundreds more nationwide go to, http://www.envirobidnet.com – Take a free 30 Day Trial (no cc required)
Most Users Ever Online: 429
Currently Online:
35 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950