Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
SD - Eagle Butte: demolition of 2 bridges
July 29, 2012
6:44 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Cheyenne: Removal and Replacement of Bridges. CONTRACT 1 LeBeau Creek Bridge Replacement Project No. A01-745 BIA Route 7, Mile Post 9.69 CONTRACT 2 Stove Creek Bridge Replacement Project No. A01-746 BIA Route 8, Mile Post 7.42 (Open Bidding with Indian Preference) SCOPE OF WORK The work consists of Removal and Replacement of: present bridges crossing LeBeau Creek and Stove Creek on the Cheyenne River Indian Reservation. Each Contract will be bid separately: the construction period for Contract 1 will be 180 calendar days and the construction period for Contract 2 will be 365 calendar days Bids will be received on the Bid Form provided herein and should identify on the outside of the envelope of the project being bid. Bids due 08/09

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
83 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar