Asbestos abatement and demolition of a commercial structure located at 126 Hagins Street. Scope of Work/Description of Project Activities: Asbestos Abatement: The successful SC DHEC licensed asbestos abatement company shall remove all asbestos items described in the SUMMIT AHERA/NESHAP Asbestos Inspection Report (attached Exhibit A) SCDHEC requirements, including a manifest showing items are disposed of in a SCDHEC approved landfill. SUMMIT shall provide the required on-site air monitoring, and it will be the responsibility of the selected contractor to coordinate their work schedule and project design with SUMMIT. Demolition: Demolish the entire building and completely remove from the site and in accordance with all federal, state, and local guidelines. Seed site in accordance with local erosion control requirements. Dispose of demolished items and materials promptly. On-site storage or sale of removed items is prohibited. Bids due 02/08
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
88 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950