

SC Ports Authority: Navy Base Intermodal Facility Advanced Work Package. The work includes relocation of on-site soil stockpiles to new stockpile locations to surcharge localized areas of the site. The work also includes the demolition of three buildings, abandoned site utilities, the Viaduct Road Bridge and associated entrance and exit ramps.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
41 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3055
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20211
Posts: 28445
Newest Members:
Kim, Tiannuo, RBC Logistics, Ed Etefia, Midwest SteelAdministrators: JOHN: 7602, John: 7210