Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
SC - North Charleston: bulkhead and piles demoliton
May 5, 2013
10:29 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Veterans Terminal Bulkhead Reconstruction, Veterans Terminal, North Charleston, South Carolina; The Work Includes Clean Up, Demolition, removal of failed bulkhead, & reconstruction of new bulkhead. Reconstruction work includes, but is not limited to, installation of sheet piles, concrete piles, reinforcing, storm drainage systems, grading, asphalt paving, pavement markings, chain link fencing, seeding, & erosion control measures.
A Mandatory Pre-Bid Conference Will Be Held on Tuesday, May 7, 2013, at 10:00am, at the CNBCT Construction Office, 2025 Bainbridge Avenue, North Charleston, SC. Bids due 05/30

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
101 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar