Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
SC - LEXINGTON CO: Edmund Solid Waste Management Complex Fueling Station Closure,
July 22, 2018
9:27 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

LEXINGTON CO: The Edmund Solid Waste Management Complex Fueling Station Closure, Removal and Installation: The project involves closure and removal of the existing vehicle Fueling Station, and construction of a new Fueling Station at another location at the Lexington County Edmund Landfill located at 498 Landfill Lane, Lexington County South Carolina. The closure and removal of the existing Fueling Station will include but is not limited to: removal of the underground storage tank, fuel dispensing equipment, piping, electrical and instrumentation, demolition of the reinforced concrete tank pad, dispenser island and building base, disposal of the removed tank, equipment and waste, removal of the fuel management and inventory system equipment, and environmental assessment of the area following the removal and demolition activities per South Carolina Department of Health and Environmental Control (SCDHEC) requirements. The installation of the new Fueling System will include but is not limited to: providing, installing and testing all equipment, materials and supplies associated with the following: a 15,000 gallon double wall underground storage tank, three (3) diesel dispensers, a Diesel Emission Fluid (DEF) dispensing and storage system, a fuel management system, a fuel system inventory management and leak detection system, a building for housing equipment, materials and supplies, and reinforced concrete pads for the dispenser island, fueling pad, tank excavation cover andbuilding floor. Installation, testing and documentation of the new Fueling System will be completed in accordance with manufacturer recommendations and SCDHEC regulations

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
40 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar