Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
SC - ISLE OF PALMS: MARINA REHABILITATION The project involves the demolition of all docks
July 19, 2020
8:49 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

ISLE OF PALMS: MARINA REHABILITATION The project involves the demolition of all docks and water-side appurtenances on the Morgan Creek Portion of the site including all pilings, gangways, fixed piers, floating docks, and marine utility infrastructure associated with the dock system. The project also involves the new construction of a floating marina facility that includes marine utilities such as shore power, fire suppression system, potable water, marine pumpout, and fuel dispensing utility services. Bulkhead re-coating is included as a bid alternate. Portions of this project shall be design-build.In general, the contractor shall include the following in their scope of work: 1. Demolition of all docks and water-side appurtenances on the Morgan Creek portion of the site (piling, gangways, floating docks, fixed piers, and utilities). Include removal of all piling below the mudline. 2. Design, furnish and install new floating dock system and associated anchorage3. Design, furnish and install gangways as well as associated connections, platform, etc. 4. Furnish and install all marine electrical system components to and including upland panels and equipment 5. Furnish and install marine fuel system from the bulkhead adjacent connection out (as indicated on the plans)6. Furnish and install potable water and sewer system on docks and up gangways to the upland connection points7. Furnish and install fire protection system to serve the new dock system 8. Design/build services for on-dock fuel hut. 2 III. 9. Related work as indicated in the plans and specifications to provide fully functioning dock and marine utility systems. 10. The work may also include, at the discretion of the City, selected alternates such as the re-coating of the steel sheet pile bulkhead (or portions thereof), additional utility work, alternate floating dock decking, etc.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
53 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar