HAMPTON: The scope of work includes: the complete demolition and disposal of condemned structures located within the Town limits on 12 separate parcels. The bid amount shall include the removal of all construction materials above and below grade for each parcel. All underground utilities such as water, gas and sewer connections are to be terminated and sealed at the street right-of-way and the work shall include the removal of all buried pipes and footings for each parcel. Lots shall be left clean and free of debris and include trimming of overgrowth, bush hogging, stump/dead tree removal, vine removal and leveling with clean fill and seeded. All materials from the sites shall be disposed of properly in accordance with all regulations. Asbestos testing has been completed on all parcels. Prior to demolition work commencing, the successful bid-der will have to provide evidence that they are qualified to do asbestos and lead paint testing and removal. A Demolition Permit, any required Tree Permit and a Town Business License is required by the contractor who will be doing the demolition and clean-up work. Cost of demolition and cleaning needs to be itemized and listed separately for each property.
Details to this bid and hundreds more natio nwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
96 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090