Renewable Water Resources: Gilder Creek WRRF RAS Pump Station and Secondary Clarifier 1 & 2 Improvements Project: Work includes Demolition of existing RAS Building No.1 and removal of existing mechanical and electrical com-ponents; Demolition of mechanical aerators in Aeration Basins No. 1 and 2; Demolition of existing Secondary Clarifiers No. 1 and 2 sludge collection and scum removal equipment including walkway, center platform and handrail; Demolition of existing scum baffles in Secondary Clarifiers No. 3 and 4; Construction of a new RAS Building with associated pumps, electrical, instrumentation and piping to facilitate connection to new and existing improvements; Installation of new sludge collection and scum removal equipment in Secondary Clarifiers No. 1 and 2; Installation of walk-on launder covers on Secondary Clarifiers No. 1, 2, 3, and 4; Installation of new mechanical aerators in Aeration Basins No. 1 and 2; Erosion control, site cleanup, asphalt replacement, seeding, and other restoration; Replacement, protection, and/or relocation of miscellaneous utilities located in the project area, as required, to perform the Work
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
76 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090