Estill: Demolition - Former Manufacturing Building: The scope of work includes: the complete demolition and disposal of the former manufacturing building located at 440 Grayson Street, SE, Estill, South Carolina. The bid amount shall include the removal of all construction materials above and below grade for each parcel. All underground utilities such as water, gas and sewer connections are to be terminated and sealed at the street right-of-way and the work shall include the removal of all buried pipes and footings for each parcel. The lot shall be left clean and free of debris and include trimming of overgrowth, bush hogging, stump/dead tree removal, vine removal and leveling with clean fill and seeded All materials from the site shall be disposed of properly in accordance with all regulations. Asbestos testing has been completed on the building. Prior to demolition work commencing, the successful bidder will have to provide evidence that they are qualified to do asbestos removal. A Demolition Permit, any required Tree Permit and a Town Business License is required by the contractor who will be doing the demolition and clean-up work. Cost of demolition and cleaning needs to be itemized.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
37 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950