This project consists of the demolition of a portion of a warehouse complex owned by the Town of Cheraw. The project is the selective demolition of the oldest portion of the warehouse formerly known as the B.C. Moore office & warehouse complex. The building is a mixture of load bearing block, steel post framing & wood/timber framing. Demolition shall include the building, building utilities, both above & below grade to the limits of demolition (as shown on the demolition drawings). Demolition shall include below grade masonry & building foundations. The masonry fire wall separating the portion of the work scheduled for demolition & the warehouse building to remain, shall be protected from damage throughout the demolition Bids due 03/04
Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial - 15% discount for DF members if you subscribe (use code D0246 when taking a trial to qualify)
Most Users Ever Online: 429
Currently Online:
88 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950