RI - (DAS): RIDOT: Design-Build Services for Washington Bridge No. 700 Demolition. The Rhode Island Department of Transportation is soliciting proposals for the demolition of the Washington Bridge Westbound will include the removal of the bridge superstructure above the bearings along spans. The demolition will include the removal of the existing bridge deck, parapets, spandrel facade arch beams, drop in prestressed concrete AASHTO I-beams, post tensioned concrete cantilever beams, steel plate girders, and the Gano Street off-ramp 3 cell non prismatic cast-in-place reinforced concrete box structure. The demolition of the Washington Bridge Westbound superstructure will include the removal of the west abutment approach slab and integral backwall in span
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
82 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030