Rhode Island Turnpike and Bridge Authority: Newport/Pell Bridge Partial Depth Deck Replacement East Approach Spans 2E to 22E . 200,000 SF of partial depth Hydro-Demolition and replacement of the concrete roadway deck from curb to curb. Full depth Demolition and replacement of reinforced concrete joint headers and installation of new joint seals. Localized full depth Demolition and installation of shear studs
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
106 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950