Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
PA - TEN SEPARATE BRIDGE DEMOLITION PROJECTS
March 24, 2024
8:49 AM
Avatar
Admin
Forum Posts: 6930
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

785519 Demolition PA PennDOT, SOUTH WHITEHALL T: (100743) MISCELLANEOUS, PA 309 & Tilghman I/C Demo. Project Cost Range: $200,000.00 - $499,999.99. This project consists of 2024-04-18
785518 Demolition PA PennDOT, NEW CASTLE: (100743) BRIDGE REPLACEMENT, East Washington Street Br. Project Cost Range: $5,000,000.00 - $7,499,999.99. The description and loca 2024-04-18
785331 Demolition PA Little Conestoga Creek Foundation: (RFQ) Construction of the Mennonite Home Floodplain Restoration. The Little Conestoga Creek Foundation is seeking Contrac 2024-04-12
785153 Demolition PA PennDOT, UPPER DUBLIN T: (98225) BRIDGE REPLACEMENT, County Bridge #83: Butler Pk o/ Prophecy Ck. Project Cost Range: $1,000,000.00 - $2,499,999.99. The 2024-05-09
785149 Demolition PA Montgomery County Department of Assets & Infrastructure Replacement of Bridge #146. This project involves the full bridge replacement of Montgomery County B 2024-04-16
784998 Demolition PA PennDOT: (E05923) (SOI/LOI) Construction Inspection, 2024 Cumberland/Perry CM/CI 2. The Department of Transportation will retain an engineering firm to prov 2024-04-11
784971 Demolition PA Brownsville Township, Fayette County: Century Road Bridge Replacement Materials. 2024-04-01
784770 Demolition PA PennDOT, PRESTON: (115884) BRIDGE, SR 4041 over Equinunk Creek. Project Cost Range: $500,000.00 - $999,999.99. This is a bridge restoration project th 2024-03-28
784769 Demolition PA PennDOT, EAST MANCHESTER: (78888) BRIDGE RECONSTRUCTION, Wago Road Bridge. Project Cost Range: $2,500,000.00 - $4,999,999.99. This project consists of a 2024-04-18
784631 Demolition PA PennDOT, LAWRENCE: (115877) BRIDGE OVER ACTIVE RR TRACKS, River Rd Railroad Bridge. Project Cost Range: $7,500,000.00 - $9,999,999.99. This project is f 2024-05-09

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
104 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar