

774504 Demolition PA PennDOT, BELL: (81747) BRIDGE REPLACEMENT, Salina Bridge. Project Cost Range: $35,000,000.00 - $39,999,999.99. The project will replace the Salina Bridg 2024-01-11
774503 Demolition PA PennDOT, TROY: (89728) BRIDGE REPLACEMENT, SR 514 ov Tb Sugar Creek. Project Cost Range: $1,000,000.00 - $2,499,999.99. The description and location of 2024-01-25
774037 Demolition PA PennDOT, OTTO: (88628) BRIDGE REPLACEMENT, Bridge on Tram Hollow Run. Project Cost Range: $1,000,000.00 - $2,499,999.99. The description and location of 2024-01-11
773736 Demolition PA PennDOT, PERRY: (58096) BRIDGE REPLACEMENT, SR 4021: Morrison Run Bridge. Project Cost Range: $500,000.00 - $999,999.99. This project is the constructio 2024-01-11
773735 Demolition PA PennDOT: (68954) BRIDGE REPLACEMENT, SR 247 over Dundaff Creek. Project Cost Range: $500,000.00 - $999,999.99. Removal and replacement of a two-lane cor 2024-01-11
773603 Demolition PA PennDOT, GREENFIELD: (117774) R&R EXISTING SUPERSTRUCTURE WITH FULL WIDTH CONST, SR 3007 over Smoky Run. Project Cost Range: $500,000.00 - $999,999.99. 2024-01-11
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
33 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3054
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20211
Posts: 28445
Newest Members:
Tiannuo, RBC Logistics, Ed Etefia, Midwest Steel, Brett Palme JrAdministrators: JOHN: 7602, John: 7210