FAIRFIELD: (579) BRIDGE REPLACEMENT. For partial removal of existing 2-span steel through truss bridge and the construction of a 3-span Prestressed PA Bulb Tee Bridge over French Creek, having an overall span length of 339 feet and 9 inches; Also for minor approach roadway, epoxy surface treatment for bridge decks, pavement markings, drainage, and guiderail improvements all within a project length of 1000 feet (0.189 mile) as indicated on the approved drawings Bids due 01/29
For details to this bid and hundreds more nationwide go to http://www.envirobidnet.com take a Free 30 day trial and then 15% discount for DF members if you subscribe (when taking a trial use code D0246 to qualify for discount)
Most Users Ever Online: 429
Currently Online:
76 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950