Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
PA - Easton: Removal of 102-foot long single span steel I-beam bridge
June 15, 2014
7:47 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

PA 611 Bushkill Creek Br. This project involves the replacement of the 102-foot long single span steel I-beam structure carrying SR 611 over the Bushkill Creek in the City of Easton, Northampton County. The Project limits extend 500 feet from the north end of the structure, and 500 feet from the south end of the structure to the jurisdictional limits of the DRJTBC (Delaware River Joint Toll Bridge Commision). Project Cost Range: $1,000,000.00 - $2,499,999.99 Bids due 07/17

For details to this bid and hundreds more nationwide go to, http://www.envirobidnet.com - Take a free 30 Day Trial (no cc needed)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
45 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar