Becht Hall Demolition & Hazardous Material Abatement. Project Description: Project consists of the removal of selected building materials and all ACM (asbestos containing material) as noted in the drawings, specifications and Owner provided reports and direction. Building materials to be removed include, but not limited to, interior plaster and/or gypsum board on interior wood partitions, all ceilings, all finish floor materials, all plumbing fixtures, supply piping and associated above grade/slab sanitary piping, all fire protection sprinklers, branch and main lines off of the existing fire risers in the three (3) stair enclosures, and the entire electrical system within the building up to the main switch gear and existing panel. electrical power from the existing exterior pad mounted transformer back to an existing electrical panel, the existing fire risers in the three (3) stair enclosures, associated fire hose connections at each floor of the stair enclosures, and existing fire service equipment in the basement are to remain. ACM includes, but not limited to, plaster wall & patching, floor tile, pipe insulation and contaminated soil Bids due 07/30
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
98 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950