Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
PA - Canonsburg: demolitiion at WWTP
September 1, 2013
6:32 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

2013 WASTEWATER TREATMENT PLANT UPGRADES PROJECT. Contract One - General Construction: Demolition of existing tanks, equipment and piping. Installations of a new raw sewage pump station building, equipment, connecting piping and appurtenances. Installation of new screens and equipment, screenings and grit handling building, grit collection tanks and equipment, primary clarifiers and equipment, sludge thickener equipment, pumps, meters, piping and appurtenances. Purchase of panels/controls of various equipment and VFDs for pumps. New concrete pipe tunnel, connection piping and appurtenances. Installation of new odor control systems for the new raw sewage pump station and new headworks facility. Site work including excavation, backfill, debris removal, installation of site piping, fence, new access road, sidewalks, paving restoration and interior and exterior painting and other miscellaneous work for a complete installation. Coordination with Electrical and HVAC/Plumbing Contractors. Contract Two - Electrical Work: Demolition of electrical distribution equipment, conduit, wire and miscellaneous control panels. Installation of new motor control centers, control panels and associated conduit and wire. Power/control of new equipment and pumps, including VFD systems. Relocation/replacement of incoming power feeds to the plant and coordination with local electrical utility. Installation of process control systems, updating existing process control functions. SCADA system integration. Coordination with General Construction and HVAC Contractors for connection of new equipment provided under Contracts One and Three. Contract also includes site work, painting of conduit and other miscellaneous work items necessary for a complete installation Bids due 09/12

Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
50 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar