Reynolds School District: Demolition of Edgefield Buildings B & F. District is pursuing the demolition of Buildings B and F on their Edgefield Campus. Building B is an approximately 3,200 square-foot former single-family residence. It has two full floors with a full poured concrete basement. It is a wood framed structure with lath and plaster walls and ceiling. Building F is an approximately 17,000 square-foot former hospital. The building has a partial poured concrete basement on the west and crawl space to the east, south, and north. The building is brick sided with a three-foot rolled asphalt roof. It is a wood framed structure with lath and plaster walls and ceiling and some sheetrock wall systems.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
105 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950