Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
OR - Reynolds School District: Demolition of Edgefield Buildings B & F. District is pursuing the demolition o
January 29, 2023
8:46 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Reynolds School District: Demolition of Edgefield Buildings B & F. District is pursuing the demolition of Buildings B and F on their Edgefield Campus. Building B is an approximately 3,200 square-foot former single-family residence. It has two full floors with a full poured concrete basement. It is a wood framed structure with lath and plaster walls and ceiling. Building F is an approximately 17,000 square-foot former hospital. The building has a partial poured concrete basement on the west and crawl space to the east, south, and north. The building is brick sided with a three-foot rolled asphalt roof. It is a wood framed structure with lath and plaster walls and ceiling and some sheetrock wall systems.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
105 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar