Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
OR - REMOVAL AND REPLACEMENT OF AN EXISTING BRIDGE
October 12, 2014
7:38 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Drury Lane Street Improvements Project. THE PROPOSED WORK INCLUDES APPROXIMATELY THE FOLLOWING: REMOVAL AND REPLACEMENT OF AN EXISTING BRIDGE, INSTALLATION OF APPROXIMATELY 2150 LINEAL FEET OF VARYING SIZES OF STORM DRAIN PIPE, INSTALLATION OF APPROXIMATELY 1220 LINEAL FEET OF 12" WATER MAIN AND 200 LINEAL FEET OF 8" WATER MAIN AND ASSOCIATED APPURTENANCES, INSTALLATION OF APPROXIMATELY 3,400 LINEAL FEET OF CURB AND GUTTER, APPROXIMATELY 2300 SQUARE FEET OF SIDEWALK AND DRIVEWAY APPROACHES AND ASSOCIATED SIDEWALK RAMPS, COLD PLANE REMOVAL OF THE EXISTING ASPHALT SURFACE, REBUILDING THE ROAD BASE AND INSTALLING APPROXIMATELY 1500 TONS OF NEW ASPHALT ROAD SURFACE. ALSO INCLUDED WILL BE LANDSCAPING, STRIPING, MISCELLANEOUS FENCING, IRRIGATION RELOCATION AND LIGHTING INSTALLATION Bids due 10/30

For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
38 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar