Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
OR - Portland: Portland International Airport Economy Exit Plaza Replacement projec
January 24, 2016
10:45 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Portland: Portland International Airport Economy Exit Plaza Replacement project. The work includes but is not limited to: Replacement of the existing Blue Lot (Economy) Exit Plaza building with a newly constructed building including all finishes and furnishings. The work includes removal of the existing Exit Plaza building including disposal of waste materials; relocation and replacement of communication infrastructure located in the immediate vicinity of the existing and proposed Exit Plaza buildings; and site work around the existing and proposed Exit Plaza buildings including curbs, sidewalk, paving, and landscaping. The existing building shall remain in operation until the new building is fully functional. Prequalification is not required for this work. The contractor or a subcontractor need not be licensed for asbestos work under ORS 468A.720.

Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
43 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar