Port of Portland: Complete demolition and removal of the existing Dravo bulk unloader at Terminal 4 and Cranes 6376 and 6377 at Terminal 6. The bulk unloader and each crane shall be demolished in separate work windows to be coordinated with the Port. The work includes abatement of hazardous materials including but not limited to asbestos, lead paint, PCBs, and bird droppings. Bids due 12/14
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
51 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3043
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20052
Posts: 28286
Administrators: JOHN: 7602, John: 7050