Port of Newport: Port Dock 5 Pier Replacement. Through the authorization of the Port of Newport Commission, the Port of Newport is accepting bids from qualified marine contractors for the supply of material & labor for removal/replacement of existing pilings, pier superstructure, and gangway called the Port Dock 5 Pier. The contract will be awarded to the lowest responsive, responsible bidder. Engineer's estimate for the cost of the project is approximately $2.4M.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
75 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950