North Clackamas School District: Parks Building Demolition Project. The work of the contract consists of the demolition and removal of the building, its foundation, deck structures and adjacent hardscape surfaces, removal and capping-off of utilities serving the site, adding and connecting to the existing irrigation system, grading and infilling the demo area with dirt from a nearby spoils stockpile, reseeding the fill area and stockpile removal area with grass as indicated on the Scope of Work and Bid Drawings provided by HHPR
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online: John
99 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950