Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
OR - North Clackamas School District: Parks Building Demolition Project. The work of the contract consists of the demolition and
March 20, 2022
8:52 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOnlineSmall Online

North Clackamas School District: Parks Building Demolition Project. The work of the contract consists of the demolition and removal of the building, its foundation, deck structures and adjacent hardscape surfaces, removal and capping-off of utilities serving the site, adding and connecting to the existing irrigation system, grading and infilling the demo area with dirt from a nearby spoils stockpile, reseeding the fill area and stockpile removal area with grass as indicated on the Scope of Work and Bid Drawings provided by HHPR

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online: John
99 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar