Keizer: Dearborn Bridge Replacement. Prequalification is not required by the City of Keizer. The Work Is Summarized as Follows: A 55-foot Long, Single Span, Precast Concrete Bridge, Demolition of the Existing Bridge, Roadway Improvements, Earth Work, Geofoam Lightweight Backfill, Illumination, Approximately 1,500 L.F. of 6' Wide P.C.C. Sidewalk and Type A Curb and Gutter, Approximately 467 L.F. of 30" Storm Drain Pipe Replacement, and other Appurtenances Common to Bridge and Roadway Construction Improvement Projects.