Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
OR - Fossil, clinic expansion demolition
January 23, 2011
5:24 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Asher Clinic Expansion Phase II. The work to be performed shall consist of providing all materials, labor, and equipment necessary: 1. Demolition, shoring, and construction separation of portion of existing building 2. Alternation of approximately 400 SF of existing building wall. 3. Construction of approximately 1,200 SF of addition to existing building 4. Scope of work in CSI master format 2004 divisions 1, 2 (Demolition), 3(Concrete), 5(Metals) , 6 (Wood), 7 (Thermal & moisture protection), 8 (Doors & windows), 9 (Finishes), 10 (Specialty items), 12 (Furnishings), 22 (Plumbing), 23 (HVAC), 26 (Electrical), 31 (Earth work), Bids due 02/15

Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
47 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar