Howard Elementary School. Replacement Elementary School for 600 students at the Howard School Site in Eugene. A single general contractor will be selected based on competitive bidding. A construction cost estimate of $23 million was prepared based on the Design Development Documents. The scope includes construction of a new 2 story, steel framed school, demolition of the old school, and construction of site improvements. The District is currently processing a contract to do a site-work phase for this project. The purpose of this phase is to help prepare the site for winter construction. That work will include the construction of a gravel access road, a rock pad for the building site and demolition of two classrooms on the south end of the existing school. Bids due 09/14
For details to this bid and hundreds more nationwide go to, http://www.envirobidnet.com – Take a free 30 Day Trial (no cc required)
Most Users Ever Online: 429
Currently Online:
54 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950