Clean Water Services: Chicken Creek Channel Realignment and Floodplain Enhancement - Phase III (Engineers Estimate $1,100,000). The Project consists of the following work: demolish and remove a water diversion structure, water control structures, and an abandoned vault; construct a new stream channel connecting the upstream and downstream ends of New Chicken Creek; enhance the stream and protect infrastructure with encapsulated soil lifts, logs and rock; expand the wetland complex west of Chicken Creek; fill in the existing Chicken Creek channel with material salvaged from excavations and existing soil stockpile; construct, expand, alter and remove the gravel access roads; construct log habitat structures; and construct two bridge stream crossings.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
111 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950