Demolish Facility 30089. The proposed undertaking is the complete removal of the 36 LF high, 620 LF long, and 252 LF wide wood light frame structure and foundation by demolition. The site would be restored with soil, sidewalk and grass to match the surrounding grade There are several monitoring wells that are flush mount around the building that must be protected during demolition activities. This project will include asbestos abatement as well as soil remediation that must be coordinated. The estimated magnitude of the entire contract is between $1,000,000 and $5,000,000. Bids due 08/22
Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
57 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3048
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20151
Posts: 28385
Administrators: JOHN: 7602, John: 7150