Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
OH - Westerville: demolition w/hazmat at 3 properties
April 1, 2014
5:48 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Westerville: 2014 Demolition Project. The work in accordance with the Contract Documents and any addenda thereto consists of the demolition of a 2-story building at 103-107 S. State Street along with demolition of foundation walls and concrete foundations. Alternate No. A1 WORK consists of the demolition of a 1 ½-story building at 34 W. Park Street along with demolition of foundation walls and concrete foundations. Alternate No. A2 WORK consists of the demolition of a 1-story building and detached garage at 40 S. Knox Street along with demolition of foundation walls and concrete foundations. WORK for all properties shall also include the proper removal of hazardous materials (waste, asbestos, lead, etc.), site restoration, new fill, compaction, basement fill, grading, utility capping and abandonment. Engineer’s Estimate for Base Bid: $113,900.00 Bids due 04/07

To see details to this bid and hundreds more nationwide, go to http://www.envirobidnet.com

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
33 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar