Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
OH - Rossford: FORMER EAGLE POINT ELEMENTARY SCHOOL DEMOLITION. Complete pre-demolition removal of
May 22, 2022
8:50 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Rossford: FORMER EAGLE POINT ELEMENTARY SCHOOL DEMOLITION. Complete pre-demolition removal of building residuals (thermostat switches, NiCd batteries, capacitors, light tubes, etc.). Complete pre-demolition removal of regulated asbestos-containing material. Physical disconnection and on-site removal of known utilities (water, sewer, gas, phone, electric). Complete demolition, transportation, and disposal of the building (including basement/footers). C

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
66 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar