Cleveland - NEORSD: Southerly TCST Demolition Project. In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: Remove the (4) four Thermally Conditioned Sludge Thickener Tanks (TCST), 70 ft diameter, including all aluminum domes, concrete structural walls, process equipment, piping, electrical, supports, walkways and associated accessories per contract drawings and specifications. Remove the Thermally Conditioned Sludge Thickener Control House including all concrete structural walls, process equipment, piping, electrical, supports, walkways and associated accessories per contract drawings and specifications. Remove for scrap all electrical equipment, panels, conduit and wire as indicated on the contract drawings including all hangers, supports and accessories. Coordinate safe lock-out/tag-out practices with owner's construction representative to ensure that no live circuits are being disturbed. Refer to Appendix B "NEORSD Lock-out Tag-out Safety Program & Requirements" and Appendix C NEORSD Electrical Safety Program & Requirements" for additional information. Remove all existing pavement, curbs and obstructions in highlighted area on drawings down to established grade elevations and install fill material, top soil, fertilizer, seed, mulch and related items necessary to complete landscaping work per drawings and specifications. The Engineer's Estimate for the Southerly TCST Demolition Project is $350,000.00 Bids due 06/18
Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter code D0246 when taking at trial to qualify)
Most Users Ever Online: 429
Currently Online:
75 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950