Avon Lake: WALKER ROAD WATER TOWER DEMOLITION PROJECT. Provide all labor, equipment, tools, materials, site security and access maintenance, debris and dust mitigation measures, mobilization and transportation necessary for the demolition and removal of the existing/abandon tower structure, closure of pipe infrastructure, excavation to remove tower and fence footers, regrading and stabilization of the site and together with all related work as specified and shown on the Drawings, all in accordance with specifications and plans on file in the office of the Clerk of the Board of Municipal Utilities.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
36 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950