Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NY -Village of Frankfort: Contract 1A*Replacement of West Main Street Bridge over Moyer Creek and Contract 1B*
October 27, 2024
8:51 AM
Avatar
Admin
Forum Posts: 7030
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Village of Frankfort: Contract 1A*Replacement of West Main Street Bridge over Moyer Creek and Contract 1B*Moyer Creek Stream Improvements at West Main Street. Contract 1A*Replacement of West Main Street Bridge over Moyer Creek Contract 1B*Moyer Creek Stream Improvements at West Main Street The Owner is the Village of Frankfort and the work site is/are located in the Village of Frankfort, Herkimer County, New York. The projects limits extend from: the intersections of West Main Street with Cemetery Street to Lock Street, and from approximately 350 feet upstream to 300 feet downstream of the West Main Street Bridge. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the Plans and described in these Specifications including, but not necessarily limited to the following: Contract 1A: The project includes removing and replacing the existing bridge carrying West Main Street over Moyer Creek. The new structure will consist of a multiple adjacent prestressed concrete box beam superstructure with concrete deck. The substructure will consist of integral abutments supported on drilled micropiles. The existing concrete encased steel girders and substructure will be completely removed. All traffic will be detoured around the site to provide for a full road closure of West Main Street during construction. The project includes approximately 200 feet of full depth reconstruction. The Contractor will be allowed to entirely close the West Main Street Bridge during construction. Supplemental instructions are included in the Contract Drawings modifying the staged construction details shown in the Contract 1A Drawings. Contract 1B: The project also includes approximately 650 feet of stream channel improvements, including lowering the streambed up to 6 feet at the existing dam downstream of the bridge. The new channel walls will consist of approximately 850 feet of soldier pile walls, approximately 75 feet of stacked stone retaining walls, and

Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
57 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar