Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NY - Port Authority of New York and New Jersey: George Washington Bridge Project
August 4, 2019
8:58 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Port Authority of New York and New Jersey: George Washington Bridge – Cashless Tolling Infrastructure Via Work Order. The work under this contract consists generally of furnishing and installing cashless tolling infrastructure including: drilled shaft foundations; demolition and removal of existing toll booths and plazas; furnishing and installing gantries, equipment shelters, pavement, traffic signage and pavement markings; electrical work; environmental remediation including lead and asbestos abatement; noise control and abatement; maintenance of traffic and related work at the toll plaza areas at the Upper Level and Lower Level of the George Washington Bridge and the vicinities thereof in Fort Lee, New Jersey, all as directed by Engineer and in accordance with Work Order(s) issued by the Engineer.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
98 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar