VILLAGE OF PAWLING: WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT.The project generally consists of the following work: Contract 1 - General Construction - Providing and installing new SBR treatment system; new headworks building and equipment; chemical storage facilities and equipment; new filtration building and equipment; new aerobic/anoxic digester and equipment; instrumentation for new processes including SCADA; improvements to existing tankage; demolition and selective demolition of buildings and tankage; removal of chemicals; flushing and testing; temporary facilities; repair/improvements of existing buildings; coordination with utility companies and other prime contractors; lawn restoration; trenching and excavation; trench surface restoration; erosion and sediment control; grading; paving; and record drawings
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
95 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090