

Triborough Bridge & Tunnel Authority: Replacement of the Queens Approach at the Bronx-Whitestone Bridge. The Scope of Work requires the staged complete removal and replacement of the existing superstructure and substructure of the Queens Approach of the Bronx-Whitestone Bridge and consists of the following: Installation of excavation support systems (inclusive of dewatering) and mini-pile foundations; installation of temporary support systems; staged installation of temporary, movable and permanent traffic barriers; new standpipe system; temporary and permanent electrical power; communications and roadway lighting; staged demolition of the existing cellular abutment, superstructure and substructure; staged reconstruction of paving and on-grade ramps; replacement of existing orthotropic deck overlay system; miscellaneous steel repairs; incidental lead abatement; and maintenance and protection of traffic. Bids due 02/14
Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below
Most Users Ever Online: 429
Currently Online:
46 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3054
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20211
Posts: 28445
Newest Members:
Tiannuo, RBC Logistics, Ed Etefia, Midwest Steel, Brett Palme JrAdministrators: JOHN: 7602, John: 7210