Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NY - NY bridge deck, etc demolition
December 26, 2010
5:50 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Triborough Bridge & Tunnel Authority: Replacement of the Queens Approach at the Bronx-Whitestone Bridge. The Scope of Work requires the staged complete removal and replacement of the existing superstructure and substructure of the Queens Approach of the Bronx-Whitestone Bridge and consists of the following: Installation of excavation support systems (inclusive of dewatering) and mini-pile foundations; installation of temporary support systems; staged installation of temporary, movable and permanent traffic barriers; new standpipe system; temporary and permanent electrical power; communications and roadway lighting; staged demolition of the existing cellular abutment, superstructure and substructure; staged reconstruction of paving and on-grade ramps; replacement of existing orthotropic deck overlay system; miscellaneous steel repairs; incidental lead abatement; and maintenance and protection of traffic. Bids due 02/14
Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
79 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar