![sp_Feed](https://demolitionforum.com/wp-content/sp-resources/forum-themes/demodefault/images/sp_Feed.png)
![sp_TopicIcon](https://demolitionforum.com/wp-content/sp-resources/forum-themes/demodefault/images/sp_TopicIcon.png)
Replacement of Little Valley Bridge No. 9, Ninth Street over Little Valley Creek. The work consists of the demolition and replacement of the existing two-span concrete structure on Ninth Street and an adjacent two-span concrete structure carrying the Pat McGee Trail. Both existing structures have overall clear span of approximately 28 feet. The existing structures will be replaced with a twin cell precast concrete box culvert with each cell measuring 16 feet wide by 8.5 feet tall. The proposed structure will be 70 feet in length at the centerline on a radius of 110 feet. Bids due 03/01
Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below (special discount available to forum members)
Most Users Ever Online: 429
Currently Online:
62 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3048
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20151
Posts: 28385
Administrators: JOHN: 7602, John: 7150