Kingston: Edmund T. Cloonan Water Filtration Plant Backwash Storage Tank Replacement Project. The project consists of the demolition of the existing 50,000 gallon elevated backwash storage tank and construction of a new 100,000 gallon composite elevated backwash storage tank. Installation of the new backwash storage tank will include a glass-lined, bolted-steel tank elevated on a concrete pedestal. New piping will be provided in order to connect to the existing inlet/outlet pipe and existing drain pipe Bids due 07/31
Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter code D0246 when taking at trial to qualify)
Most Users Ever Online: 429
Currently Online:
100 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950