Florida: WWTP Building Demolition. The project consists of the following: 1. Coordination with the Village of Florida WWTP Operator and/or his designatee. 2. Demolish the two buildings that house the trickling filter and sludge thickener. 3. Remove the buildings' vertical wood supports. 4. Furnish and install a handrail around the perimeter of the sludge thickener. 5. The Contractor shall provide all labor, supervision, materials, equipment, tools, utilities, and incidentals necessary to complete the Work as specified in the Technical Specifications and as shown on the Plans. 6. The Contractor shall obtain all necessary permits.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
136 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950