Niagara Frontier Transportation Authority: Demolition of 66 Cayuga Road. Location: 66 Cayuga Road, Cheektowaga, NY. Description: The Work of this project provides for the furnishing of all labor, materials, appliances, tools, equipment and plant, and the performing of all Work in accordance with the specifications and drawings, with exception of work that is expressly and specifically not included in the project. The project consists of one (1) contract. Project Scope: The demolition and removal of an existing two story residential house/office. The building is a wood framed construction with a full height basement with cast in place concrete walls.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
55 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950