Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NV - PYRAMID/McCARRAN BUILDING DEMOLITION PROJECT PHASE II
August 2, 2015
5:56 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

PYRAMID/McCARRAN BUILDING DEMOLITION PROJECT PHASE II. The federally-funded work items performed under this contract include: structure abatement and demolition of 36 buildings and out structures at various locations near the Pyramid Way and McCarran Boulevard intersection in Sparks, Nevada. The majority of the work includes asbestos abatement, hazardous materials removal, and demolition of the structures including below grade foundations, foundation slabs, basements and miscellaneous surface improvements. The work also includes termination of gas, water and sewer services per the drawings and specifications. Removal and disposal of all materials off site, minor site grading and cleanup. Engineer's Opinion of Probable Cost: $750,000 to $1,250,000 Bids due 08/21

Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter code D0246 when taking at trial to qualify)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
80 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar